Restaurant Construction Costs in San Francisco

If you are interested in opening a new restaurant, you will need to include certain items in your budget.  Having enough money for construction, permits, equipment, furniture and design fees is vital.   We have seen the cost of construction and equipment rise quite substantially in the last two years.  In this post we will focus on construction costs alone, which do not include any of the other items mentioned above.  People new to building a restaurant from scratch often lump construction costs in with the costs of permits, kitchen equipment, and furniture, but in reality, those costs are all different, and must be line-itemed separately from the get-go. It may not be obvious at first, but the money for each type of item goes to different parties, and seen in that light, you should get it right from the start. 

According to the RS Means Construction Cost Data Report, which is where most of the industry (including building departments) reference construction costs, building a restaurant costs on average $238.12 per square foot (and let me repeat… this does not include equipment, furniture, permits or design fees!).

We have found that amount to be fairly accurate.  For a completely “vanilla” space (nothing you’d see on our website) the cost seems to hover around $165.00 per square foot, and for a space made to a “high design” level you can expect to pay $238.12 per square foot. At the very least, and for a healthy project expect to pay $200 per square foot. 

The one segment of construction where we have seen the highest increase in cost has been mechanical, which includes hoods and ducting, air conditioning and heating, gas lines and plumbing. This portion of work can take up to 40% of your budget if you have to start with a space not already fitted with this work.   This wasn’t always the case but, the shortage of mechanical contractors has driven up the cost.

Another thing to keep in mind is that the smaller your space, the higher the cost per square foot for construction. You will most likely pay more per square foot than a larger space because you won’t be able to take advantage of quantity discounts. 

There are a lot of factors that make up a construction budget so once you have a space in mind, contact a design professional to walk through the space and help you understand what is necessary to get the it up to code, and how much work it will take to get you operational.  Later, once a design is in place, architectural drawings can go out to bid to a few general contractors to firm up the price.  

 We suggest that when you are working on your business plan that you budget with a 10-20% contingency margin so that you have the opportunity to build out the space how you want it.  Very often, construction budgets are too small and we have to bear the bad news that the owner can’t afford their vision, or that they need to find additional investors.  All in all, allowing for the average per square foot cost of $238.12 in your front end planning is a good idea for the healthy completion of your project. 

So you want to open a restaurant

I am sure you have heard that restaurants have a large turn over so it might be obvious to say you should do your due diligence prior to getting into the restaurant business. Perhaps not everyone knows what that due diligence entails. Here are some tips for you.

Read More

June 2014 - TED "Talks"

TED Talks recently printed a list of the greatest quotes about design, some of which were displayed at the Target Design Café at TED2014. The space features cloth strips that form a canopy over the café where hundreds of quotes about design are printed. Here are ten of our favorites at Gi Paoletti Design Lab.

Read More

May 2014 - To Expeditor or not

I have worked on projects as large as 100 million square feet and on those projects we only sometimes used permit expediters. It depended on the complexity of the project, the site location and the city, state or country we were working in. Now that I am working on mostly restaurants and bars there is no need for permit expediters in my world, but there still may be in yours, so I will take this time to explain what they are and what they can do for you.

Read More

April 2014 - Office Space (Not the movie!)

When our clients are shopping for office space, they make a pretty good guess as to how much square footage they will need in their next space based on what they lack in their current space. This can be a good start.  It can also be very misleading. Read below for some tips that can help you determine how much space to look for when shopping for commercial office space.

Read More

March 2014 - New Design Trends

We have some big news to announce! Gi Paoletti Design Lab is growing and with that is coming a new website this month.  This may be the last time you see this old one.  Once we roll out the new website we will make additional announcements about our company growth. With every new year come new trends.

Read More